JOIN OUR TEAM

Project Description

Client: Big-D Construction Location: Brigham City, UT Surface Area: 239,000 sf

The Challenges

The Nucor Manufacturing Plant was a very successful project for Nucor, J&M Steel, and Big-D Construction. Nucor selected J&M to erect the structure and negotiated the project pricing.

The Brigham City Utah Nucor facility is Nucor’s fourth metal building systems plant and employs over 200 people.

Annual capacity at this facility is over 45,000 tons, and more than 190,000 tons is produced by all four plants.

“I would rate J&M Steel as one of the best pre-engineered metal building erection contractors in the Western United States. They stand behind their work and were easy to work with. They are professional in their business dealings and were very responsive when asked to re-sequence work due to delays in owner provided materials.” – Brian Frasier – Big D Construction