The Hobbs Power Plant included 5 pre-engineered metal buildings totaling 25,000 sf with 75,000 sf of metal wall panels.
Access to the project was very limited and congested — which required daily scheduling and coordination.
The Hobbs Power Plant included 5 pre-engineered metal buildings totaling 25,000 sf with 75,000 sf of metal wall panels.
Access to the project was very limited and congested — which required daily scheduling and coordination.