J&M Steel worked closely with Jacobsen Construction & Mountain States Steel to design and maintain the budget & constructability of the building.
The Steel Erection was completed in 10 weeks start to finish.
J&M Steel participated in daily coordination meeting with the General Contractor & conducted daily safety meetings. J&M Steel also coordinated daily with Mountain States Steel for on-time deliveries due to tight site conditions.
Our Project Manager worked closely with the contractor & design team to ensure we had the latest approved drawings. We then pass this information onto our field superintendent & foreman’s to be built per plans & specs from these latest approved drawings.
Steel Erection of (1) Structural Steel Multi-level (3) Story office building
- Architect: Architectural Nexus
- Engineer: Reaveley Engineers & Associates
- Steel Fabricator: Mountain States Steel
- Length of Project: 10 Weeks
- Materials: Structural Steel and Decking